How to Upload a 360 of a Minecraft Model
Question 1: Which file types are supported in Model Coordination?
Reply 1: 3D RVT and DWG files, NWC files (tracked) exported from Revit and AutoCAD verticals, and IFC files (tracked) exported from AutoCAD compages, MEP, and Ceremonious 3D 2018 and onwards, ARCHICAD, Revit, MagiCAD for Revit, and Tekla Structures, are all currently supported for coordination and clash detection. Other NWC files, other IFC files, and VUE files are supported for assemblage and can be viewed in combination with other supported file formats, but don't support clash detection. Acquire more than.
Question 2: Why can't I see all of my files that are displayed in Certificate Direction?
Answer 2: Any file types that are supported for upload to Document Management but which are not listed in Answer 1 are not displayed in Model Coordination.
Question 3: Why has my coordination space been deactivated?
Answer 3: Whatever coordination spaces that are inactive for 60 days or more are automatically deactivated. This reduces resource usage on projects with limited activity. Equally before long as a new model or version is uploaded to the folder associated with the coordination space, it is automatically reactivated.
Question 4: How are administrator, member, and folder permissions controlled in Model Coordination?
Answer 4: See the Administration publication for full general information nearly administration in BIM 360.
The Add Project Administrators topic describes how to add a fellow member as an administrator for your project. You can make a member an administrator for all modules they have admission to, or but for a specific module such as Model Coordination.
Projection administrators can then command project member access.
In addition to module access, projection administrators can also command admission to individual folders. Projection members demand at least View permissions for the coordination space folder or any of its parent folders to exist able to work in Model Coordination:
- In the Project Admin module, click the Services tab.
- Select Model Coordination in the left panel to open the Model Coordination administration page.
- Here you tin discover the relevant folder for each coordination infinite, and also check that the coordination space is active.
Question 5: What should I do if my clashes won't load on the Clashes tab, or if my clash tests neglect?
Answer 5: There are several reasons why clash detection may not be working correctly on your project. Yous may have lots of models in your coordination infinite, models of large sizes, or models with complex geometry resulting in a loftier number of clashes. There are a few troubleshooting steps y'all can endeavour:
-
Remove whatever indistinguishable models or geometry from your coordination space to reduce excessive clash information:
- If y'all have models representing each expanse or level of a project, and also a federated model containing all of those private models over again, attempt removing the federated model. This will avert the duplicate content existence clashed again.
- If y'all've uploaded models containing linked models, try recreating 3D views without any linked models included to reduce the amount of duplicated geometry.
- If y'all take duplicate geometry in multiple models or views, attempt removing any unneeded models or views.
-
Create multiple coordination spaces and have fewer models in each. For case, create a coordination space for each building in a project, or for each level of a edifice, or phase of a project.
-
Reduce the size of your models. For example, publish fewer views from your Revit models.
At that place are also various causes that tin't exist solved past reducing model numbers or size, or changing your coordination space setup. If these troubleshooting steps don't work, or you experience a spinner on the Clashes tab that doesn't resolve, the development squad can investigate and aid to resolve the error.
Follow the steps below to provide the team with useful information:
- On the Clashes tab, open the Developer Tools window for your browser.
- Find the option to clear the console, and and then refresh the page.
- On the Network tab, look for the second instance of a 'Breakdowns' endpoint. Select it and then copy the contents of the Response sub-tab.
- Below the 'Breakdowns' endpoint, locate the GUID entries. Select the 2nd of the GUID entries and copy the contents of the Response sub-tab.
- Ship the copied contents with a cursory description of what happened using the online Contact Support grade.
Question 6: How do I notice my project and model-set IDs?
Reply six: When y'all open up the Model Coordination module and select a coordination space, your project and model-set IDs are shown in the page URL:
Providing the whole URL when reporting problems using the online Contact Support course gives our team a starting indicate for investigation.
Question seven: Why practise my exported IFC or DWG models from Revit appear misaligned in Model Coordination, even though they looked correct when linked in Revit?
Answer vii: This result may be caused by shared coordinates either non existence published to the linked files, or not being saved into the exported file.
-
For example, take an architectural Revit model (Arch.RVT) that has a linked structural model (Struct.RVT) and MEP model (MEP.RVT). The architectural model has shared coordinates including a rotation to True Due north. The linked models all appear aligned in Revit. The structural model is exported to DWG (Struct.DWG) and the MEP model is exported to IFC (MEP.IFC).
-
When viewing Arch.RVT, Struct.DWG, and MEP.IFC in Model Coordination, both the structural and MEP models are rotated in relation to the architectural model. This is due to the shared coordinates existence respected in the architectural model only not existing in the DWG and IFC. In this instance, the misalignment can be resolved by publishing the shared coordinates in Revit from Arch.RVT into the linked files Struct.RVT and MEP.RVT.
Question 8: Are at that place whatsoever known issues in Model Coordination?
Respond 8: There are a few items that have been reported every bit issues by customers, which are either the expected beliefs or for which there are no current plans to address:
-
Using the driblet-down carte or search choice to filter clashes in the clash grid does not cause the colour intensity of the cells to adjust to the new highest number of clashes.
-
The plan may freeze or crash when attempting to display views in a project where all of the models from the views have been deleted.
-
When clashes or clash groups are selected in the viewer, there is no tooltip or other indication in the Clashes panel nearly whether there are any duplicates or, if so, how many.
If you notice whatever other issues, yous can report them using the online Contact Support form.
Source: https://knowledge.autodesk.com/search-result/caas/CloudHelp/cloudhelp/ENU/BIM360D-Model-Coordination/files/BIM360D-Model-Coordination-Model-Coordination-FAQs-html-html.html